Turnall has gone through milestones of success in its history, it is indeed our pride that we are a systems oriented organisation. September 20 –23 marked a time of testing, reviewing and correcting our selves as the SABS Audit Team carried out the audit. All employees were keen to get an evaluation of their performance with regards to maintaining the standards.
The audit was a unique one because it was the first time in the history of the company to have three systems running and being audited at the same time. It called for every member of the team to think, talk, walk and work the systems language and culture.
I can confidently say we are and remain the forerunner of systems in the country if not in the region. To confirm this fact, in our closing meeting the EMS Auditor even remarked that, “ I must say we were very impressed to realize that your shopfloor workers even know the legal requirements expected of them and the company. This is amazing because in most of the companies we have audited you don’t find that kind of awareness.”
The findings raised were as follows:
| Finding |
Location |
Dept |
Corrective action |
Target completion date |
Responsibility |
| According to work instruction EMSWI –02 Rev 01 water consumption will be recorded weekly this could not be verified. |
HRE |
Engineering |
The procedure EMSWI-02 is to be revisited. Water consumption records are going to be kept as per the revised procedure |
|
|
| Methodology for determining significant rating was not done according to what was stipulated on procedure No. OHSMSP 01. Hazard and risk identification. |
HRE |
WCP |
|
|
|
| Fibre treatment Area
The maximum mass load which is designed to lift up granite rollers need to be conspicuously and clearly marked on the beam of the gantry as per legal requirements. |
HRE |
Production |
The maximum load on the gantry is to be clearly marked. All the other gantries are to be checked for legal compliance |
|
|
| Process Areas
During the time of the audit , most of the process areas audited , the electrical distribution boards were not labeled and marked as per legal requirements |
HRE |
Engineering |
All electrical boards are to be marked/labeled as per legal requirements. |
15/10/04 |
Electrical controller |
| QA Office
A very neat system for capturing NCR’s is in use and well administrated. It was noted that the serial numbers of the NCR’s are not used for reference and also does not appear on the register, this could simplify tracking of findings. |
HRE |
WCP |
NCR form to be reviewed so that only necessary information is left on the form. |
28/09/04/ Done |
QA Officer |
Such a good performance can be attributed to good leadership, clear corporate values, objectives, targets and most importantly a family kind of relationship between management and staff.